Void Patch Angle Installation

BlazeFrame “VPA” Void Patch Angle Installation
- Cut out one side and web of BlazeFrame track profile to accommodate installation around Wall Cavity Penetrations (i.e pipe sleeves, conduit, etc…) and fasten to substrate
- Cut section of VPA profile (using same width intumescent strip as track profile) a min 2” longer (min 1” overlap each end) than void
- Peel back intumescent on installed profile at both ends of the void and insert VPA (intumescent facing outward) into void sliding 1/2” leg between track profile and substrate
- Fasten the VPA with framing fasteners at each end into the leg of installed profile
- Reapply intumescent “knife cutting” off excess so that intumescent strip on VPA and opposing ends of void in installed profile are in butted contact.
- For voids on both sides of Wall Cavity Penetrations repeat steps 2 through 5 installing additional VPA Profile on the opposing side of the wall cavity